Sample Project Support Diagnostic

A sample view of how ArrayPoint turns uploaded project information into organized findings, scope gaps, RFI Questions for Review, risks, procurement concerns, cost/change exposure, and next actions.

Led by a Project Support Manager and Powered by Array IQ.

This is an illustrative sample deliverable. Actual findings depend on the project information provided by the client team.

Sample Project Context

Riverside Community Center Renovation

Project Type
Public building renovation
Project Phase
Preconstruction / procurement
Project Location
Midwest U.S.
Project Status
Design documents issued for pricing
Primary Concern
Scope clarity, bid readiness, RFI review, and budget exposure
Engagement
Tier 1 — Project Support Diagnostic

The project team uploaded drawings, specifications, sketches, photos, meeting notes, emails, budget notes, and early procurement information. ArrayPoint reviewed the available information to identify missing information, scope gaps, RFI Questions for Review, procurement concerns, cost/change exposure, and recommended next actions.

Section 1

Executive Summary

Current Project Condition

The project appears ready for early pricing review, but several scope, document, procurement, and budget items should be clarified before bid finalization.

Highest Priority Findings
  • • Several scope items need clarification before final bid review.
  • • Existing condition photos and field notes should be linked to the related drawing areas.
  • • Multiple finish, electrical, and sitework items may need clarification before award.
  • • Long-lead equipment and owner-furnished items should be tracked.
  • • Cost/change exposure may increase if scope assumptions are not clarified before procurement.
Recommended Next Step

Create a focused clarification package, update the procurement tracker, and review the RFI Questions for Review with the project team before bid finalization.

Section 2

Project Memory Snapshot

CategoryConfirmed InformationOpen QuestionSource TypePriority
ScopeInterior renovation is included in current pricing setFinish responsibility needs confirmationDrawings / specsHigh
ProcurementMechanical equipment may be long-leadProcurement path needs confirmationMeeting notesHigh
BudgetCurrent budget includes contingencyAllowance assumptions need reviewBudget notesMedium
Existing ConditionsPhotos show wall and ceiling conditionsNeed location tagging by room/areaPhotosMedium
CloseoutCloseout requirements are referencedWarranty/O&M requirements need trackingSpecificationsMedium
Section 3

Document Review Summary

Documents Reviewed
  • Drawings
  • Specifications
  • Sketches
  • Photos
  • Meeting notes
  • Emails
  • Budget notes
  • Procurement notes
Missing or Unclear Information
  • Final finish schedule confirmation
  • Owner-furnished equipment list
  • Long-lead item list
  • Existing condition photo locations
  • Bid package responsibility breakdown
  • Closeout requirement checklist
Recommended Document Actions
  • Create document index
  • Tag photos by room or scope area
  • Confirm latest drawing and specification set
  • Build source-of-truth tracker
  • Link open questions to source documents
Section 4

Scope Gap Register

Scope AreaPotential GapWhy It MattersRecommended ActionPriority
Interior finishesFinish schedule does not clearly identify all replacement areasMay create bid exclusions or pricing gapsConfirm finish responsibility by roomHigh
ElectricalExisting panel capacity not confirmedMay affect pricing and scheduleConfirm with design team or electrical contractorHigh
MechanicalEquipment lead times not confirmedMay affect procurement scheduleAdd to long-lead trackerHigh
SiteworkLimits of restoration are unclearMay create change exposureClarify restoration boundaryMedium
CloseoutWarranty and O&M expectations need trackingMay delay closeoutAdd to closeout trackerMedium
Section 5

RFI Questions for Review

TopicDraft QuestionRelated ImpactPriorityClient Review Status
Finish ResponsibilityPlease confirm which rooms require new floor finish, wall finish, and ceiling finish.Cost / scopeHighFor review
Electrical CapacityPlease confirm whether existing electrical panels have capacity for the proposed equipment.Cost / scheduleHighFor review
Mechanical EquipmentPlease confirm expected procurement path and lead time for mechanical equipment.Procurement / scheduleHighFor review
Site RestorationPlease confirm limits of site restoration after exterior work is complete.Scope / costMediumFor review
Closeout RequirementsPlease confirm required O&M manuals, warranties, and owner training expectations.CloseoutMediumFor review

ArrayPoint prepares RFI Questions for Review. The client project team remains responsible for reviewing, approving, and submitting official RFIs.

Section 6

Starter Risk Register

RiskPotential ImpactPrioritySuggested MitigationOwner
Unclear finish scopeBid exclusions or change exposureHighConfirm finish scope before awardProject team
Long-lead equipment not trackedProcurement delayHighAdd mechanical equipment to long-lead registerProject team
Existing conditions not fully mappedField conflictsMediumTag photos and confirm affected areasProject team
Missing responsibility breakdownScope gaps between tradesHighBuild bid package responsibility matrixProject team
Closeout requirements not tracked earlyCloseout delaysMediumCreate closeout trackerProject team
Section 7

Initial Issue / Action List

Action ItemRecommended OwnerDue TimingStatus
Confirm latest drawing and specification setProject teamThis weekOpen
Review RFI Questions for ReviewProject managerThis weekOpen
Create procurement trackerProcurement leadNext 7 daysOpen
Confirm long-lead itemsProject manager / contractorNext 7 daysOpen
Review budget exposure itemsOwner / PMNext 14 daysOpen
Create closeout trackerProject coordinatorNext 14 daysOpen
Section 8

Schedule Impact Log

Potential Schedule ImpactRelated IssueDecision NeededPriority
Mechanical equipment lead timeProcurement path not confirmedConfirm equipment lead time and ordering responsibilityHigh
Finish clarification delayFinish responsibility unclearConfirm scope before final pricingHigh
Existing condition reviewPhotos not tied to locationsConfirm field conditions by areaMedium
Closeout documentation delayRequirements not tracked earlyBuild closeout trackerMedium
Section 9

Procurement Readiness Snapshot

Current Procurement Readiness

Status: Needs clarification before final bid review

Procurement Concerns
  • Bid package responsibilities need clearer breakdown
  • Long-lead equipment should be tracked
  • Exclusions and assumptions should be reviewed before award
  • Clarification questions should be resolved before final pricing
  • Owner-furnished items should be confirmed
Recommended Procurement Actions
  • Create procurement tracker
  • Create long-lead item register
  • Review exclusions and assumptions
  • Confirm bid package responsibility split
  • Review RFI Questions for Review before award
Section 10

Budget / Change Exposure Snapshot

Exposure ItemPotential CausePotential ImpactRecommended Tracking Action
Finish scope uncertaintyRoom-by-room finish responsibility unclearPossible change exposureConfirm finish scope before award
Electrical capacity unknownExisting panel capacity not verifiedPossible added electrical workRequest clarification
Site restoration boundary unclearRestoration limits not definedPossible added sitework costClarify restoration limits
Mechanical lead-time issueEquipment procurement not confirmedPossible acceleration or substitution costAdd to long-lead tracker
Closeout requirements unclearO&M and warranty scope not trackedPossible closeout delayAdd to closeout tracker
Section 11

30-Day Project Action Plan

Next 7 Days
  • Confirm latest document set
  • Review RFI Questions for Review
  • Create procurement tracker
  • Identify long-lead items
Next 14 Days
  • Confirm scope gaps
  • Review exclusions and assumptions
  • Build budget/change exposure log
  • Create closeout tracker
Next 30 Days
  • Update risk register
  • Review procurement readiness
  • Prepare executive project health summary
  • Establish weekly project support rhythm
Recommended Next Step

Tier 2: Project Support & Controls Setup Package

Based on the sample diagnostic findings, the next recommended service would be the Tier 2: Project Support & Controls Setup Package. This would turn the diagnostic findings into working project controls, trackers, logs, and reporting templates.